Renovation of swimming pool at Sint-Jans-Molenbeek

The purpose of the project was to adapt the hydraulic circuits and the equipment for water treatment in connection with the renovation of the Louis Namèche swimming pool.

This project required dismantling of the current installation before any other works could begin. The new water treatment consists of 2 independent treatment installations for the 50 m pool and the teaching pool. For the 50 m pool the installation consists of 5 filters of dia. 2800 mm with a total filtering capacity of 830 m³/h.

Facts and figures

Project categories

First of all, the existing installation had to be dismantled. The new water treatment consists of 2 independent treatment installations for the 50 m pool and the teaching pool. For the 50 m pool the installation consists of 5 filters of dia. 2800 mm with a total filtering capacity of 830 m³/h.

  • Vacancies

News Alerts

xThis website is optimized for Internet Explorer 7.0 or higher and Firefox 3.5 and higher. Unfortunately, if you use of a lower browser version it will have consequences for the optimal viewing of this website.